Mannino Subdivision
Wesley Chapel, FL 33545
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/20/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
The Mannino Subdivision in Wesley Chapel, FL, is a large-scale residential development project currently in the permitting stage, with significant earthwork involving over 20,000 cubic yards and extensive site disturbance that includes multiple drainage features and utility trenches. This presents a critical opportunity for hauling providers to secure contracts for materials movement, excavation, and site preparation. Key contacts for this project include the owners Andrea & Josephine Mannino and William Ryan Homes, as well as Tampa Civil Design, the engineer of record.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-17SWFWMD_ERPCaptured SWFWMD_ERP_918265 from swfwmd_erp
- 2026-05-18SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_918265_861e92fd from swfwmd_erp_plans
- 2026-05-18PASCOPACaptured PASCOPA_23-25-20-0000-00600-0023_861e92fd from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- 2 wet detention ponds (Pond 1 and Pond 2) with control structures (CS-1 and CS-2); multiple curb inlets (D-3 through D-10 labeled); multiple mitered end sections (MES-2
- MES-3
- MES-4
- MES-5
- MES-7
- MES-8); 7-foot drainage easement swales with 4:1 sodded slopes; underdrains (6-inch perforated pipe); 1 FDOT Type C inlet (D-10); 1 FDOT Type D inlet (CS-1); existing drainage box inlets (D-94
- D-95
- D-96
- D-97)
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 6.7 mi | 13.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.3 mi | 28.7 |
| quarry | West Florida Aggregate | Webster | 16.7 mi | 33.3 |
| sand pit | County Line Mine | Spring Hill | 20.1 mi | 40.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 21.8 mi | 43.7 |
| quarry | Brooksville Quarry | Brooksville | 22.1 mi | 44.1 |
| quarry | Center Hill Mine | Brooksville | 24.3 mi | 48.7 |
| quarry | Calcium Plant | Jacksonville | 24.9 mi | 49.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_918265 | 2026-05-17 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_918265_861e92fd | 2026-05-18 | Open ↗ |
| pascopa | PASCOPA_23-25-20-0000-00600-0023_861e92fd | 2026-05-18 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 23-25-20-0000-00600-0023
- Strap
- 23-25-20-0000-00600-0023
- Address
- Acreage
- 9.96 ac
- Sq ft
- 433,858
No sale on record
- Just (market)
- $3,254
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log