Leads/861e92fd
Approved · planningPasco County

Mannino Subdivision

Wesley Chapel, FL 33545

~1.6kloads
fill dirt
11 wk
Lifecycle
Permitted as of Apr 20, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mannino Subdivision

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/20/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
9.96 ac
Parcel 23-25-20-0000-00600-0023
Est truck loads
1,933
29,000 cy net
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Andrea & Josephine Mannino
The story

The Mannino Subdivision in Wesley Chapel, FL, is a large-scale residential development project currently in the permitting stage, with significant earthwork involving over 20,000 cubic yards and extensive site disturbance that includes multiple drainage features and utility trenches. This presents a critical opportunity for hauling providers to secure contracts for materials movement, excavation, and site preparation. Key contacts for this project include the owners Andrea & Josephine Mannino and William Ryan Homes, as well as Tampa Civil Design, the engineer of record.

Why this is a hauling opportunity: Base unknown/other (20) | size signal: 10.0 ac disturbed, ~1611 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_918265 from swfwmd_erp
  2. 2026-05-18SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_918265_861e92fd from swfwmd_erp_plans
  3. 2026-05-18PASCOPA
    Captured PASCOPA_23-25-20-0000-00600-0023_861e92fd from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
29,000 cy
From plan-sheet notes
Fill volume
Net haul
29,000 cy
Est loads
1,933
@ 15 cy/load
Max grading change27 ft
Utility trenches (each LF ≈ 1 cy spoil)
water main
1,500 LF
storm sewer
1,200 LF
sanitary sewer
1,100 LF
Drainage features (9)
  • 2 wet detention ponds (Pond 1 and Pond 2) with control structures (CS-1 and CS-2); multiple curb inlets (D-3 through D-10 labeled); multiple mitered end sections (MES-2
  • MES-3
  • MES-4
  • MES-5
  • MES-7
  • MES-8); 7-foot drainage easement swales with 4:1 sodded slopes; underdrains (6-inch perforated pipe); 1 FDOT Type C inlet (D-10); 1 FDOT Type D inlet (CS-1); existing drainage box inlets (D-94
  • D-95
  • D-96
  • D-97)
Plan notes: General notes state export fill quantities shall not exceed 29,000 cubic yards per Pasco County Development Review Standard Site Plan Notes. Geotechnical engineering delegated to UES (813) 896-2587; no specific soil classification reported on these plan sheets.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
6.7 mi
Round trip
13.5 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill6.7 mi13.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 14.3 mi28.7
quarryWest Florida AggregateWebster16.7 mi33.3
sand pitCounty Line MineSpring Hill20.1 mi40.2
quarryBrooksville South Cement PlantBrooksville21.8 mi43.7
quarryBrooksville QuarryBrooksville22.1 mi44.1
quarryCenter Hill MineBrooksville24.3 mi48.7
quarryCalcium PlantJacksonville24.9 mi49.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Andrea & Josephine Mannino
Engineer of Record
TAMPA CIVIL DESIGN, LLC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9182652026-05-17Open ↗
swfwmd_erp_plansSWFWMD_PLANS_918265_861e92fd2026-05-18Open ↗
pascopaPASCOPA_23-25-20-0000-00600-0023_861e92fd2026-05-18Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
23-25-20-0000-00600-0023
Strap
23-25-20-0000-00600-0023
Address
Acreage
9.96 ac
Sq ft
433,858
Owner of record
MANNINO ANDREA & JOSEPHINE
Last sale

No sale on record

Appraiser valuation
Just (market)
$3,254

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/861e92fd