Leads/8569e407
Approved · planningHillsborough County

SIX TOWNHOMES BUILDING W/ POND

3407 WHITTIER ST, TAMPA, FL, 33619

~5loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Feb 3, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

SIX TOWNHOMES BUILDING W/ POND

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/3/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$177K
Actual — from source record
Acreage
0.047 ac
Parcel 1590960000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
3101 LAKE ELLEN LANE, LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0468678-001-EG from fdep_erp
  2. 2026-07-03FL_DOR_CADASTRAL
    Captured FDOR_1929104BX000025000130A_8569e407 from fl_dor_cadastral
  3. 2026-07-05HCPA
    Captured HCPA_1590960000_8569e407 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.8 mi
Round trip
7.6 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa3.8 mi7.6
quarryCentral State Aggregates LLCZephyrhill17.0 mi34.1
quarryCaloosa MaterialsRuskin18.9 mi37.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 29.0 mi57.9
quarryFour CornersLithia29.9 mi59.8
sand pitCounty Line MineSpring Hill33.3 mi66.6
quarrySouth Pasture MineLithia35.7 mi71.4
quarryWingate Creek MineLithia36.9 mi73.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
3101 LAKE ELLEN LANE, LLC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0468678-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_1929104BX000025000130A_8569e4072026-07-03Open ↗
hcpaHCPA_1590960000_8569e4072026-07-05Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1590960000
Strap
A-10-29-19-4BX-000025-00013.0
Address
3407 WHITTIER ST, TAMPA
Zip
33619
Acreage
0.047 ac
Sq ft
2,032
Homestead
NO
Owner of record
HIRPARA LAKHAN
Last sale
2025-12-30
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/8569e407