Leads/832fcff3
Approved · unknownPINELLAS County

USACE 404 — 144 LAKE SHORE DR

144 LAKE SHORE DR, PALM HARBOR, FL, 34684

~44loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Mar 19, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 144 LAKE SHORE DR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/19/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.1768 ac
Parcel 365883
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DEB, SOURABH
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~44 est. loads (+6) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0467792-001-EE from fdep_spgp
  2. 2026-06-08PCPAO
    Captured PCPAO_366299_832fcff3 from pcpao
  3. 2026-07-05PCPAO
    Captured PCPAO_365883_832fcff3 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
21.2 mi
Round trip
42.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa21.2 mi42.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 24.2 mi48.4
sand pitCounty Line MineSpring Hill24.5 mi49
quarryCentral State Aggregates LLCZephyrhill27.4 mi54.7
quarryCaloosa MaterialsRuskin33.1 mi66.3
quarryBrooksville QuarryBrooksville37.2 mi74.5
quarryBrooksville South Cement PlantBrooksville37.9 mi75.9
quarryCalcium PlantJacksonville40.9 mi81.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DEB, SOURABH

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0467792-001-EE2026-05-28Open ↗
pcpaoPCPAO_366299_832fcff32026-06-08Open ↗
pcpaoPCPAO_365883_832fcff32026-07-05Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
366299
Strap
29-27-16-48510-000-1440
Address
144 Lake Shore Dr N
Zip
34684
Acreage
0.1768 ac
Sq ft
7,701
Year built
1965
Use
0110 Single Family ...
Subdivision
<span title="LAKE SHORE ESTATES 1ST ADD">Lake Shore Estates ...</span>
Owner of record
DEB, SOURABH
SOMAN, TANIA SUSAN
Last sale
2021-10-01
$525,000
Appraiser valuation
Just (market)
$450,867
Assessed
$450,867
Taxable
$450,867

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/832fcff3