Leads/801-uptown-orange-fl-5cc5434b
Approved · unknownOrange County

801 UPTOWN

801 N ORANGE AVE S/T/R: 23/22S, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

801 UPTOWN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
801 UPTOWN
Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10AN38 from npdes_stormwater
  2. 2026-05-21NPDES_STORMWATER
    Captured FLR10R001 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
19.1 mi
Round trip
38.1 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont19.1 mi38.1
sand pitIndependent MineDavenport19.7 mi39.5
sand pitFour Corners Sand MineBrooksville20.1 mi40.3
quarryS & L Materials IncKISSIMMEE22.6 mi45.2
sand pitHilochee Sand MineDavenport23.3 mi46.7
quarryBeeline MineOrlando23.5 mi47.1
sand pitAstatula Sand PlantJacksonville23.8 mi47.6
sand pitLake Sand PlantJacksonville24.6 mi49.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10AN382026-05-21Open ↗
npdes_stormwaterFLR10R0012026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/801-uptown-orange-fl-5cc5434b