Leads/800-2nd-ave-s-pinellas-fl-860d14a3
Approved · unknownPinellas County

800 2ND AVE S

800 2ND AVE S

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

800 2ND AVE S

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
1.5367 ac
Parcel 177585
Est truck loads
Needs site plan parse
Sources seen
9
Public records referencing this job
General Contractor
A CASTLE CONSTRUCTION
📞 (561) 272-1207
Developer / Applicant
TLP RE MF III VI SAINT PETERSBURG I OWNER LLC
Why this is a hauling opportunity: Building permit | Connector base: 50 | size signal: 1.5 ac disturbed (+8) | size signal: 1.5 ac disturbed (+8) | size signal: 1.5 ac disturbed (+8) | size signal: 1.5 ac disturbed (+8)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-04-19STPETE_CLICK2GOV
    Captured 10-12000699 from stpete_click2gov
  2. 2026-05-17PCPAO
    Captured PCPAO_155835_f8b4b47c from pcpao
  3. 2026-05-21PCPAO
    Captured PCPAO_160454_f8b4b47c from pcpao
  4. 2026-05-22PCPAO
    Captured PCPAO_158382_f8b4b47c from pcpao
  5. 2026-05-25PCPAO
    Captured PCPAO_154036_f8b4b47c from pcpao
  6. 2026-05-27PCPAO
    Captured PCPAO_149234_f8b4b47c from pcpao
  7. 2026-06-03PCPAO
    Captured PCPAO_171608_f8b4b47c from pcpao
  8. 2026-07-02PCPAO
    Captured PCPAO_166693_f8b4b47c from pcpao
  9. 2026-07-05PCPAO
    Captured PCPAO_177585_f8b4b47c from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
TLP RE MF III VI SAINT PETERSBURG I OWNER LLC
1600 E 8TH AVE STE A132-A TAMPA, FL 33605
Contractor
A CASTLE CONSTRUCTION
2 active projects · Hillsborough
📞 (561) 272-1207

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov10-120006992026-04-19Open ↗
pcpaoPCPAO_155835_f8b4b47c2026-05-17Open ↗
pcpaoPCPAO_160454_f8b4b47c2026-05-21Open ↗
pcpaoPCPAO_158382_f8b4b47c2026-05-22Open ↗
pcpaoPCPAO_154036_f8b4b47c2026-05-25Open ↗
pcpaoPCPAO_149234_f8b4b47c2026-05-27Open ↗
pcpaoPCPAO_171608_f8b4b47c2026-06-03Open ↗
pcpaoPCPAO_166693_f8b4b47c2026-07-02Open ↗
pcpaoPCPAO_177585_f8b4b47c2026-07-05Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
155835
Strap
19-31-17-78378-001-0010
Address
800 2nd Ave S
Zip
33701
Acreage
1.5367 ac
Sq ft
66,939
Year built
1983
Use
1832 General Office ...
Subdivision
<span title="ST PETERSBURG, CITY OF BLK 49 PARTIAL REP">St Petersburg, City ...</span>
Owner of record
TLP RE MF III VI SAINT PETERSBURG I OWNER LLC
Last sale
2022-11-01
$10,500,000
Appraiser valuation
Just (market)
$7,535,000
Assessed
$7,535,000
Taxable
$7,535,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/800-2nd-ave-s-pinellas-fl-860d14a3