Leads/7fe5af6e
Approved · planningCharlotte County

EO - Mirror Lakes

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
Permitted as of Mar 23, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

EO - Mirror Lakes

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/23/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
LKRT, LLC / Attn: J. Glenn Robinson
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_921648 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
0.5 mi
Round trip
1.1 mi
TypeNameCityOne-wayRT mi
sand pitWashington Loop MinePunta Gorda0.5 mi1.1
quarryBermont Materials AlicoPunta Gorda2.4 mi4.7
quarryHalls MineNaples11.1 mi22.1
sand pitWatermelon PitPunta Gorda12.3 mi24.6
quarryHighlands County Shell PitSebring12.3 mi24.7
quarryWright Farms PitNocatee12.4 mi24.9
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA12.5 mi25.1
quarryNeal AggregatesPunta Gorda14.5 mi29
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
LKRT, LLC / Attn: J. Glenn Robinson

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Standard General))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Charlotte County Permits
Port Charlotte Building Construction
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9216482026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Charlotte
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/7fe5af6e