Approved · unknownPINELLAS County
Cleanup (petroleum cleanup) — RAY'S GARAGE
321 GULF BLVD, INDIAN ROCKS BEACH, FL, 33785
~244loads
fill dirt + base rock
2 wk
Lifecycle
Active as of Jun 15, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — RAY'S GARAGE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.9771 ac
Parcel 266612
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: ~244 est. loads (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87984043 from fdep_cleanup_sites
- 2026-06-19PCPAOCaptured PCPAO_273862_7900913d from pcpao
- 2026-06-24PCPAOCaptured PCPAO_261701_7900913d from pcpao
- 2026-06-26PCPAOCaptured PCPAO_266612_7900913d from pcpao
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
ANGELO'S RECYCLED MATERIALS - LARGO MRF · Largo
One-way
5.2 mi
Round trip
10.3 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
25.2 mi
Round trip
50.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 25.2 mi | 50.5 |
| quarry | Caloosa Materials | Ruskin | 28.0 mi | 56 |
| quarry | Central State Aggregates LLC | Zephyrhill | 40.5 mi | 81.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 41.2 mi | 82.4 |
| sand pit | County Line Mine | Spring Hill | 41.7 mi | 83.4 |
| landfill | ANGELO'S RECYCLED MATERIALS - LARGO MRF | Largo | 5.2 mi | 10.3 |
| transfer station | GREEN ENERGY TRANSPORT TRANSFER STATION (FKA WALKER HAULING) | Clearwater | 8.1 mi | 16.1 |
| transfer station | CLEARWATER MATERIALS TRANSFER FACILITY | Clearwater | 8.2 mi | 16.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87984043 | 2026-06-15 | Open ↗ |
| pcpao | PCPAO_273862_7900913d | 2026-06-19 | Open ↗ |
| pcpao | PCPAO_261701_7900913d | 2026-06-24 | Open ↗ |
| pcpao | PCPAO_266612_7900913d | 2026-06-26 | Open ↗ |
Parcel Detail
Pinellas County Property Appraiser
PropertyPCPAO ↗
- Folio
- 273862
- Strap
- 12-30-14-41829-000-0010
- Address
- 321 Gulf Blvd
- Zip
- 33785
- Acreage
- 0.9771 ac
- Sq ft
- 42,562
- Year built
- 2017
- Use
- 1121 Strip Store - ...
- Subdivision
- IBR PLAZA LLC SUB
Owner of record
I R B PLAZA LLC
Last sale
2016-08-01
$100(transfer)
Appraiser valuation
- Just (market)
- $2,900,000
- Assessed
- $2,900,000
- Taxable
- $2,900,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/7900913d