Approved · unknown
Limestone Quarry — UBD
12849 Philips Hwy, JACKSONVILLE, FL, 32256
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Limestone Quarry — UBD
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Operating limestone quarry — supplier/customer location for haulers. | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_7776144 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
STRATTON ROAD CLASS I TRANSFER STATION · St Augustine
One-way
8.3 mi
Round trip
16.6 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
17.7 mi
Round trip
35.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 17.7 mi | 35.4 |
| quarry | SRM Materials East Palatka | Murfresboro | 31.3 mi | 62.5 |
| sand pit | Goldhead Sand Plant | Jacksonville | 34.8 mi | 69.5 |
| quarry | The Chemours Company FC LLC | Starke | 36.1 mi | 72.2 |
| sand pit | Grandin Sand Plant | Jacksonville | 37.5 mi | 74.9 |
| sand pit | Keuka Sand Plant | Jacksonville | 43.2 mi | 86.4 |
| quarry | Edgar Minerals, Inc. | Davenport | 45.4 mi | 90.7 |
| transfer station | STRATTON ROAD CLASS I TRANSFER STATION | St Augustine | 8.3 mi | 16.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_7776144 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/7769435f