Leads/74ae2a82
Approved · unknown

Ready Mix Concrete Plant — MARTIN PAVING CO NON-EXIST

COLBERT LANE/PALM COAST PRKWY, FLAGLER BEACH, FL, 32036

Load estimate pending
Lifecycle
Completed as of Jul 19, 1989
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Ready Mix Concrete Plant — MARTIN PAVING CO NON-EXIST

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0350007 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY · Bunnell
One-way
7.9 mi
Round trip
15.8 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
22.6 mi
Round trip
45.1 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials East PalatkaMurfresboro22.6 mi45.1
sand pitKeuka Sand PlantJacksonville44.3 mi88.6
quarryEdgar Minerals, Inc.Davenport45.7 mi91.3
sand pitGrandin Sand PlantJacksonville46.1 mi92.1
landfillFLAGLER CDS, INCORPORATED C&D DEBRIS FACILITYBunnell7.9 mi15.8
transfer stationORMOND BEACH TRANSFER STATIONOrmond Beach19.5 mi39
transfer stationTHE OLD CITY TRANSFER STATIONElkton22.5 mi45.1
landfillTILLMAN RIDGE WASTE MANAGEMENT FACILITYElkton23.7 mi47.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_03500072026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/74ae2a82