Leads/728afc51
Approved · unknownWalton County

FDOT — BAY COUNTY ITS FIBER DEPLOYMENT - ITS COMMUNICATION SYSTEM

Walton County — FDOT Contract T3882

Load estimate pending
Lifecycle
Completed as of Apr 10, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — BAY COUNTY ITS FIBER DEPLOYMENT - ITS COMMUNICATION SYSTEM

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$3.2M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT utilities contract — BAY COUNTY ITS FIBER DEPLOYMENT - ITS COMMUNICATION SYSTEM. Vendor: TRAFFIC MANAGEMENT SOLUTIONS, LLC. Cost: $3,178,728. | FDOT public project (+15) | size signal: $3,178,728 valuation (+12) | FDOT public project (+15) | size signal: $3,178,728 valuation (+12) | FDOT public project (+15) | size signal: $3,178,728 valuation (+12) | FDOT public project (+15) | size signal: $3,178,728 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T3882_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
WEST BAY C&D DISPOSAL FACILITY · Panama City Beach
One-way
7.2 mi
Round trip
14.4 mi
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
22.5 mi
Round trip
45 mi
TypeNameCityOne-wayRT mi
sand pitSandhills Plant 2Dothan22.5 mi45
sand pitMVM Landfill, LLCDeFuniak Springs29.5 mi58.9
sand pitPanama City QuarryMurfresboro33.5 mi67.1
sand pitMOSSEYHEAD MINESCENTURY38.5 mi77
sand pitMossy Head WestDothan38.5 mi77
sand pitG2C Sand MineNiceville43.9 mi87.8
landfillWEST BAY C&D DISPOSAL FACILITYPanama City Beach7.2 mi14.4
landfillSTEELFIELD ROAD LANDFILLPanama City Beach7.5 mi15
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Walton County Permits
30A / DeFuniak Springs Building Department
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T3882_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Walton
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/728afc51