Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — MOBIL-REALTY #385
2812 W KENNEDY BLVD, TAMPA, FL, 33609
~13loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — MOBIL-REALTY #385
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$1.3M
Actual — from source record
Acreage
0.051 ac
Parcel 1168950000
Est truck loads
—
Needs site plan parse
Sources seen
11
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: $1,336,900 valuation (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87861089 from fdep_cleanup_sites
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922410 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_1168950000_5f8857df from hcpa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942847 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_1168950000_4fd69312 from hcpa
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983712 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_1168950000_70b770c3 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88085757 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_1168950000_f516735f from hcpa
- 2026-06-26FL_DOR_CADASTRALCaptured FDOR_1829223NY000001000030A_70b770c3 from fl_dor_cadastral
- 2026-06-29HCPACaptured HCPA_1168950000_70385f05 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.0 mi
Round trip
5.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 3.0 mi | 5.9 |
| quarry | Caloosa Materials | Ruskin | 17.0 mi | 33.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.5 mi | 43 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.5 mi | 61 |
| quarry | Four Corners | Lithia | 34.1 mi | 68.2 |
| sand pit | County Line Mine | Spring Hill | 34.0 mi | 68.1 |
| quarry | Wingate Creek Mine | Lithia | 38.1 mi | 76.1 |
| quarry | South Pasture Mine | Lithia | 39.0 mi | 78.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87861089 | 2026-06-04 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922410 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1168950000_5f8857df | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87942847 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_1168950000_4fd69312 | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983712 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_1168950000_70b770c3 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88085757 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_1168950000_f516735f | 2026-06-26 | Open ↗ |
| fl_dor_cadastral | FDOR_1829223NY000001000030A_70b770c3 | 2026-06-26 | Open ↗ |
| hcpa | HCPA_1168950000_70385f05 | 2026-06-29 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1168950000
- Strap
- A-22-29-18-3NY-000001-00003.0
- Address
- 2812 W KENNEDY BLVD, TAMPA
- Zip
- 33609
- Acreage
- 0.051 ac
- Sq ft
- 2,205
- Homestead
- NO
Owner of record
TAMPA ACQUISITIONS INC
Last sale
2023-01-30
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/70b770c3