Leads/7004b4ff
Approved · unknown

CCCL — CCCL coastal construction (Coastal CCCL owner)

4268 Diamond Shore Way 26, Fort Pierce, FL 34949

Load estimate pending
Lifecycle
Permitted as of Jul 2, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — CCCL coastal construction (Coastal CCCL owner)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 7/2/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_SL000472 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Capron Trails Mine · Jupiter
One-way
15.5 mi
Round trip
31.1 mi
TypeNameCityOne-wayRT mi
quarryCapron Trails MineJupiter15.5 mi31.1
quarryFort Pierce MineJacksonville16.9 mi33.8
sand pitPalm City MineGreenacres22.8 mi45.7
sand pitBlue Goose MineFort Pierce25.1 mi50.1
sand pitVero Rock and SandVero Beach25.7 mi51.4
quarry1412 Canal PointHammond26.1 mi52.1
sand pitMC320 MinePalm City26.7 mi53.3
sand pitSunshine MineFort Pierce36.5 mi73
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_SL0004722026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/7004b4ff