Leads/6f27d37b
Approved · unknownPINELLAS County

Cleanup (petroleum cleanup) — MYRON'S SPORTWEAR LTD

5290 PARK BLVD, PINELLAS PARK, FL, 34665

~143loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — MYRON'S SPORTWEAR LTD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.5712 ac
Parcel 87070
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
T T L PROPERTY HOLDINGS L L C
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: ~143 est. loads (+12) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-15FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87984052 from fdep_cleanup_sites
  2. 2026-06-19PCPAO
    Captured PCPAO_82345_6f27d37b from pcpao
  3. 2026-06-24PCPAO
    Captured PCPAO_81308_6f27d37b from pcpao
  4. 2026-06-26PCPAO
    Captured PCPAO_87070_6f27d37b from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
17.5 mi
Round trip
34.9 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa17.5 mi34.9
quarryCaloosa MaterialsRuskin18.8 mi37.6
quarryCentral State Aggregates LLCZephyrhill35.5 mi71.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 40.0 mi80.1
sand pitCounty Line MineSpring Hill41.8 mi83.6
quarryWingate Creek MineLithia42.7 mi85.4
quarryFour CornersLithia45.3 mi90.5
quarrySouth Pasture MineLithia48.3 mi96.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
T T L PROPERTY HOLDINGS L L C

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_879840522026-06-15Open ↗
pcpaoPCPAO_82345_6f27d37b2026-06-19Open ↗
pcpaoPCPAO_81308_6f27d37b2026-06-24Open ↗
pcpaoPCPAO_87070_6f27d37b2026-06-26Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
82345
Strap
28-30-16-00000-340-0200
Address
5290 Park Blvd
Zip
33781
Acreage
0.5712 ac
Sq ft
24,881
Year built
1963
Use
4190 Industrial Not ...
Subdivision
NONE
Owner of record
T T L PROPERTY HOLDINGS L L C
Last sale
2014-12-01
$100(transfer)
Appraiser valuation
Just (market)
$650,831
Assessed
$578,320
Taxable
$578,320

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/6f27d37b