USACE 404 — PIGGINS, DARREN / STANDAFER, W SCOTT / 048705 0019 / BAY
1920 BAYSHORE DR, ENGLEWOOD, FL, 34223
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 12/1/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0331977-002-EI from fdep_spgp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 5.5 mi | 10.9 |
| sand pit | Washington Loop Mine | Punta Gorda | 28.1 mi | 56.1 |
| quarry | Bermont Materials Alico | Punta Gorda | 29.3 mi | 58.6 |
| quarry | 4M-31 Mine | Alva | 36.1 mi | 72.1 |
| quarry | Wingate Creek Mine | Lithia | 38.0 mi | 76 |
| quarry | Halls Mine | Naples | 38.7 mi | 77.5 |
| sand pit | Watermelon Pit | Punta Gorda | 39.6 mi | 79.2 |
| quarry | Highlands County Shell Pit | Sebring | 40.0 mi | 80 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_spgp | FDEP_SPGP_0331977-002-EI | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- SARASOTA
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/6c43f1de