Leads/6bcbb9a4
Approved · application_filedHillsborough County

Sweet Life

SWFWMD ERP — site address pending

~517loads
fill dirt
3 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Sweet Life

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.0M
Actual — from source record
Acreage
4.652 ac
Parcel 0805780000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Forestar (USA) Real Estate Group, Inc.
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 4.7 ac disturbed, $1,047,077 valuation, ~517 est. loads (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_938974 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_212736ZZZ000003403500U_6bcbb9a4 from fl_dor_cadastral
  3. 2026-06-03HCPA
    Captured HCPA_0805780000_6bcbb9a4 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
11.5 mi
Round trip
23 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill11.5 mi23
quarryTampa Cement Grinding PlantTampa20.4 mi40.7
quarryFour CornersLithia25.2 mi50.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.8 mi57.5
quarryWest Florida AggregateWebster28.8 mi57.6
sand pitGreen Bay MineDavenport31.0 mi62
sand pitGator Sand MineBrooksville31.3 mi62.6
sand pit474 Sand MineBrooksville31.4 mi62.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Forestar (USA) Real Estate Group, Inc.
10700 PECAN PARK BLVD, SUITE 150 AUSTIN, TX 78750
People (67)
  • ANTHONY W. PRESIDENT OXLEY · CEO
  • ADRIENNE PRESIDENT PETROWSKI · VICE
  • ALEX PRESIDENT MADISON · VICE
  • ALICE PRESIDENT SEABAUGH · VICE
  • ANDREW D. PRESIDENT HARRIS · VICE
  • BILL PRESIDENT MILLER · VICE
  • +61 more

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Petition for Formal Determination))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9389742026-05-17Open ↗
fl_dor_cadastralFDOR_212736ZZZ000003403500U_6bcbb9a42026-05-28Open ↗
hcpaHCPA_0805780000_6bcbb9a42026-06-03Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0805780000
Strap
U-36-27-21-ZZZ-000003-40350.0
Address
5808 VARN RD, PLANT CITY
Zip
33565
Acreage
4.652 ac
Sq ft
202,658
Homestead
NO
Owner of record
SWEET LIFE FARMS LLC
Last sale
2016-07-07
$4,185,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/6bcbb9a4