Approved · unknownOrange County
FDOT — US441/SR500 FROM WADSWORTH RD TO LAKE COUNTY LINE - RESURFAC ING
Orange County — FDOT Contract T5838
Load estimate pending
Lifecycle
Completed as of Apr 21, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — US441/SR500 FROM WADSWORTH RD TO LAKE COUNTY LINE - RESURFAC ING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$7.7M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — US441/SR500 FROM WADSWORTH RD TO LAKE COUNTY LINE - RESURFAC ING. Vendor: MASCI GENERAL CONTRACTORS, INC. Cost: $7,714,913. | FDOT public project (+15) | size signal: $7,714,913 valuation (+20) | FDOT public project (+15) | size signal: $7,714,913 valuation (+20) | FDOT public project (+15) | size signal: $7,714,913 valuation (+20) | FDOT public project (+15) | size signal: $7,714,913 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T5838_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Astatula Sand Plant · Jacksonville
One-way
8.3 mi
Round trip
16.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Astatula Sand Plant | Jacksonville | 8.3 mi | 16.6 |
| sand pit | Lisbon Sand | Lexington | 11.0 mi | 22.1 |
| sand pit | Okahumpka | Leesburg | 16.3 mi | 32.6 |
| sand pit | Independent Mine | Davenport | 18.5 mi | 36.9 |
| sand pit | Center Sand Company | Clermont | 19.1 mi | 38.2 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 20.1 mi | 40.1 |
| sand pit | Four Corners Sand Mine | Brooksville | 22.8 mi | 45.7 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 25.2 mi | 50.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T5838_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6939a68b