Approved · unknownPinellas County
6716 CENTRAL AVE
6716 CENTRAL AVE
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
6716 CENTRAL AVE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 19-31-16-67500-087-0010
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Building permit | Connector base: 50 | Stage = permit_issued — actionable now (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-04-19STPETE_CLICK2GOVCaptured 14-08000114 from stpete_click2gov
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| stpete_click2gov | 14-08000114 | 2026-04-19 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 19-31-16-67500-087-0010
- County
- Pinellas
- City
- St. Petersburg
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/6716-central-ave-pinellas-fl-65fe5a82