Leads/65dbd604
Approved · unknown

CCCL APPLICATION — Coastal permit application ME001602 (Pending applicant)

102 Sunset Ln., Anna Maria, FL 34216

Load estimate pending
Lifecycle
Filed as of May 29, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

CCCL APPLICATION — Coastal permit application ME001602 (Pending applicant)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/29/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-25FDEP_COASTAL_APPS
    Captured FDEP_COASTAL_APP_ME001602 from fdep_coastal_apps

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
13.1 mi
Round trip
26.2 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
21.8 mi
Round trip
43.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin21.8 mi43.6
quarryTampa Cement Grinding PlantTampa33.6 mi67.3
quarryWingate Creek MineLithia37.2 mi74.5
quarryFlorida Shell & Fill Company LLCNaples46.2 mi92.5
quarrySouth Pasture MineLithia48.7 mi97.4
quarryFour CornersLithia49.4 mi98.8
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton13.1 mi26.2
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota15.8 mi31.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_appsFDEP_COASTAL_APP_ME0016022026-06-25Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/65dbd604