Leads/63069ca5
Approved · application_filedManatee County

Ron DeSantis Park Flood Mitigation Site Improvements

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Ron DeSantis Park Flood Mitigation Site Improvements

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.1M
Actual — from source record
Acreage
Parcel 1972900309
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Manatee County
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $1,092,031 valuation (+12) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_924526 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_1972900309_63069ca5 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
20.9 mi
Round trip
41.9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin20.9 mi41.9
quarryWingate Creek MineLithia25.1 mi50.2
quarryFlorida Shell & Fill Company LLCNaples33.7 mi67.5
quarryTampa Cement Grinding PlantTampa36.7 mi73.5
quarrySouth Pasture MineLithia38.7 mi77.4
quarryFour CornersLithia41.6 mi83.2
quarry4M-31 MineAlva42.7 mi85.4
sand pitWashington Loop MinePunta Gorda46.4 mi92.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Manatee County

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9245262026-05-17Open ↗
fl_dor_cadastralFDOR_1972900309_63069ca52026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
1972900309
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/63069ca5