Leads/60a58a02
Approved · application_filed

WESLEY CENTER NOISE WALL

7501 BOYETTE RD, WESLEY CHAPEL, FL, 33545

Load estimate pending
Lifecycle
Filed as of May 12, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

WESLEY CENTER NOISE WALL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/12/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
COASTAL DESIGN CONSULTANTS, INC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0401953-003 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
4.6 mi
Round trip
9.3 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill4.6 mi9.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 12.9 mi25.8
sand pitCounty Line MineSpring Hill18.7 mi37.4
quarryWest Florida AggregateWebster20.5 mi41
quarryBrooksville South Cement PlantBrooksville23.0 mi46.1
quarryBrooksville QuarryBrooksville23.1 mi46.2
quarryTampa Cement Grinding PlantTampa23.7 mi47.4
quarryCalcium PlantJacksonville26.3 mi52.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
COASTAL DESIGN CONSULTANTS, INC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0401953-0032026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)