Leads/5f8aac19
Approved · planningHillsborough County

South Selmon Capacity Project

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
Permitted as of Mar 17, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

South Selmon Capacity Project

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/17/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.7M
Actual — from source record
Acreage
Parcel 1829264TE000015000030A
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Tampa Hillsborough Expressway Authority
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $1,676,201 valuation (+12) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_915140 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_1829264TE000015000030A_5f8aac19 from fl_dor_cadastral
  3. 2026-06-03HCPA
    Captured HCPA_1856450000_5f8aac19 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.1 mi
Round trip
4.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa2.1 mi4.2
quarryCaloosa MaterialsRuskin15.9 mi31.9
quarryCentral State Aggregates LLCZephyrhill21.8 mi43.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.4 mi62.8
quarryFour CornersLithia33.0 mi66
sand pitCounty Line MineSpring Hill35.1 mi70.1
quarryWingate Creek MineLithia36.9 mi73.7
quarrySouth Pasture MineLithia37.9 mi75.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Tampa Hillsborough Expressway Authority

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9151402026-05-17Open ↗
fl_dor_cadastralFDOR_1829264TE000015000030A_5f8aac192026-05-28Open ↗
hcpaHCPA_1856450000_5f8aac192026-06-03Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1856450000
Strap
A-26-29-18-4TE-000015-00003.0
Address
1013 S DAKOTA AVE, TAMPA
Zip
33606
Acreage
0.021 ac
Sq ft
933
Homestead
YES
Owner of record
MURRAY DAVID C
MURRAY KIMBERLY M
Last sale
2017-09-06
$1,150,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5f8aac19