Leads/5f0ff696
Approved · planning

CONST 2 - TWO STORY RESIDENCES

OAKWOOD STREET, TARPON SPRINGS, FL, 34689

Load estimate pending
Lifecycle
Permitted as of Jan 29, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CONST 2 - TWO STORY RESIDENCES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/29/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
NORTHSIDE ENGINEERING, INC.
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0468536-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
23.2 mi
Round trip
46.3 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill23.2 mi46.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.5 mi47.1
quarryTampa Cement Grinding PlantTampa24.0 mi48
quarryCentral State Aggregates LLCZephyrhill28.6 mi57.1
quarryCaloosa MaterialsRuskin36.0 mi72.1
quarryBrooksville QuarryBrooksville36.1 mi72.1
quarryBrooksville South Cement PlantBrooksville36.8 mi73.6
quarryCalcium PlantJacksonville39.6 mi79.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
NORTHSIDE ENGINEERING, INC.

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0468536-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5f0ff696