JENKINS CREEK
6400 SHOAL LINE BLVD., SPRING HILL, FL, 34607
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/28/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0471289-001 from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 7.2 mi | 14.4 |
| quarry | Brooksville Quarry | Brooksville | 12.8 mi | 25.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 12.8 mi | 25.7 |
| quarry | Brooksville South Cement Plant | Brooksville | 13.8 mi | 27.6 |
| quarry | Calcium Plant | Jacksonville | 15.3 mi | 30.5 |
| quarry | Center Hill Mine | Brooksville | 20.2 mi | 40.5 |
| quarry | Lecanto Mine | Crystal River | 22.5 mi | 44.9 |
| quarry | Maylen Mine | Crystal River | 25.6 mi | 51.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0471289-001 | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/5e640c3b