Leads/558-53rd-ave-n-pinellas-fl-a37dd9aa
Approved · unknownPinellas County

558 53RD AVE N

558 53RD AVE N

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

558 53RD AVE N

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0 ac
Parcel 258418
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
BRABENEC, THOMAS
Why this is a hauling opportunity: Building permit

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21STPETE_CLICK2GOV
    Captured 15-03001297 from stpete_click2gov
  2. 2026-05-21PCPAO
    Captured PCPAO_268147_f2a9e19b from pcpao
  3. 2026-05-22PCPAO
    Captured PCPAO_264032_f2a9e19b from pcpao
  4. 2026-05-25PCPAO
    Captured PCPAO_273597_f2a9e19b from pcpao
  5. 2026-05-27PCPAO
    Captured PCPAO_258418_f2a9e19b from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
14.5 mi
Round trip
29.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa14.5 mi29.1
quarryCaloosa MaterialsRuskin14.8 mi29.5
quarryCentral State Aggregates LLCZephyrhill33.9 mi67.7
quarryWingate Creek MineLithia38.7 mi77.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 40.1 mi80.3
quarryFour CornersLithia41.2 mi82.3
sand pitCounty Line MineSpring Hill42.5 mi85
quarrySouth Pasture MineLithia44.1 mi88.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BRABENEC, THOMAS
Applicant
558 53RD AVE N
558 53rd Ave N, St. Petersburg, FL 33703, USA

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov15-030012972026-05-21Open ↗
pcpaoPCPAO_268147_f2a9e19b2026-05-21Open ↗
pcpaoPCPAO_264032_f2a9e19b2026-05-22Open ↗
pcpaoPCPAO_273597_f2a9e19b2026-05-25Open ↗
pcpaoPCPAO_258418_f2a9e19b2026-05-27Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
268147
Strap
06-31-17-17523-001-1280
Address
558 53rd Ave N
Zip
33703
Acreage
0 ac
Sq ft
0
Year built
2015
Use
0133 Planned Unit D ...
Subdivision
COLONNADE
Owner of record
BRABENEC, THOMAS
Last sale
2017-03-01
$340,000
Appraiser valuation
Just (market)
$544,132
Assessed
$544,132
Taxable
$544,132

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/558-53rd-ave-n-pinellas-fl-a37dd9aa