Leads/5569ca66
Approved · application_filedPinellas County

MALKI SFR

3465 KEYSTONE RD, TARPON SPRINGS, FL, 34688

Load estimate pending
Lifecycle
Filed as of Oct 23, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

MALKI SFR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/23/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.2M
Actual — from source record
Acreage
Parcel 16 27 11 00000 330 0200
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
AFRAM MALKI
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $1,201,327 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0465815-001 from fdep_erp
  2. 2026-06-12FL_DOR_CADASTRAL
    Captured FDOR_16 27 11 00000 330 0200_5569ca66 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
20.3 mi
Round trip
40.6 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 20.3 mi40.6
quarryTampa Cement Grinding PlantTampa20.6 mi41.1
sand pitCounty Line MineSpring Hill20.9 mi41.9
quarryCentral State Aggregates LLCZephyrhill23.9 mi47.7
quarryBrooksville QuarryBrooksville33.5 mi67
quarryCaloosa MaterialsRuskin34.0 mi67.9
quarryBrooksville South Cement PlantBrooksville34.2 mi68.4
quarryCalcium PlantJacksonville37.2 mi74.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0465815-0012026-05-24Open ↗
fl_dor_cadastralFDOR_16 27 11 00000 330 0200_5569ca662026-06-12Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
16 27 11 00000 330 0200
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/5569ca66