Leads/550-mariposa-temp-use-lot-orange-fl-30a4451e
Approved · unknownOrange County

550 MARIPOSA TEMP USE LOT

550 MARIPOSA ST, ORLANDO, FL, 32801-2896

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

550 MARIPOSA TEMP USE LOT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
550 MARIPOSA TEMP USE LOT
The story

The 550 Mariposa Temp Use Lot is a site development project focused on stormwater management, currently under construction at 550 Mariposa St, Orlando, FL. With a hauling score of 85/100, this project presents significant opportunities for hauling providers due to its strong earthwork demand and active construction phase. The key contact for this opportunity is the owner-developer, 550 Mariposa Temp Use Lot, making them a critical point of engagement for potential hauling services.

Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10UX33 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
19.4 mi
Round trip
38.8 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont19.4 mi38.8
sand pitIndependent MineDavenport20.1 mi40.2
sand pitFour Corners Sand MineBrooksville20.2 mi40.5
quarryS & L Materials IncKISSIMMEE21.8 mi43.7
quarryBeeline MineOrlando22.9 mi45.8
sand pitHilochee Sand MineDavenport23.2 mi46.4
sand pitCypress SandLexington24.2 mi48.4
sand pitLake Sand PlantJacksonville24.6 mi49.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
550 MARIPOSA TEMP USE LOT

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10UX332026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/550-mariposa-temp-use-lot-orange-fl-30a4451e