Leads/550-53rd-ave-n-pinellas-fl-b5715c85
Approved · unknownPinellas County

550 53RD AVE N

550 53RD AVE N

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

550 53RD AVE N

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0 ac
Parcel 426219
Est truck loads
Needs site plan parse
Sources seen
8
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
PORA, VIORICA TRE
Why this is a hauling opportunity: Building permit

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21STPETE_CLICK2GOV
    Captured 15-03001283 from stpete_click2gov
  2. 2026-05-21PCPAO
    Captured PCPAO_385127_c64ef252 from pcpao
  3. 2026-05-22PCPAO
    Captured PCPAO_385119_c64ef252 from pcpao
  4. 2026-05-25PCPAO
    Captured PCPAO_385125_c64ef252 from pcpao
  5. 2026-05-27PCPAO
    Captured PCPAO_385107_c64ef252 from pcpao
  6. 2026-05-30PCPAO
    Captured PCPAO_385137_c64ef252 from pcpao
  7. 2026-06-03PCPAO
    Captured PCPAO_385082_c64ef252 from pcpao
  8. 2026-06-11PCPAO
    Captured PCPAO_426219_c64ef252 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
14.5 mi
Round trip
29 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa14.5 mi29
quarryCaloosa MaterialsRuskin14.7 mi29.5
quarryCentral State Aggregates LLCZephyrhill33.9 mi67.7
quarryWingate Creek MineLithia38.7 mi77.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 40.1 mi80.3
quarryFour CornersLithia41.2 mi82.3
sand pitCounty Line MineSpring Hill42.5 mi85
quarrySouth Pasture MineLithia44.1 mi88.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PORA, VIORICA TRE
Applicant
550 53RD AVE N
550 53rd Ave N, St. Petersburg, FL 33703, USA

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov15-030012832026-05-21Open ↗
pcpaoPCPAO_385127_c64ef2522026-05-21Open ↗
pcpaoPCPAO_385119_c64ef2522026-05-22Open ↗
pcpaoPCPAO_385125_c64ef2522026-05-25Open ↗
pcpaoPCPAO_385107_c64ef2522026-05-27Open ↗
pcpaoPCPAO_385137_c64ef2522026-05-30Open ↗
pcpaoPCPAO_385082_c64ef2522026-06-03Open ↗
pcpaoPCPAO_426219_c64ef2522026-06-11Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
385127
Strap
06-31-17-17523-001-1300
Address
550 53rd Ave N
Zip
33703
Acreage
0 ac
Sq ft
0
Year built
2015
Use
0133 Planned Unit D ...
Subdivision
COLONNADE
Owner of record
PORA, VIORICA TRE
PORA, EMIL S TRE
Last sale
2021-01-01
Appraiser valuation
Just (market)
$574,047
Assessed
$551,810
Taxable
$551,810

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/550-53rd-ave-n-pinellas-fl-b5715c85