Approved · unknownPinellas County
535 35TH AVE N
535 35TH AVE N
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
535 35TH AVE N
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.1627 ac
Parcel 126942
Est truck loads
—
Needs site plan parse
Sources seen
7
Public records referencing this job
Why this is a hauling opportunity: Building permit | Connector base: 50
Lifecycle Timeline
Every signal we've seen, in order
- 2026-04-19STPETE_CLICK2GOVCaptured 01-12000601 from stpete_click2gov
- 2026-04-19STPETE_CLICK2GOVCaptured 02-02000062 from stpete_click2gov
- 2026-05-17PCPAOCaptured PCPAO_143676_ba10cb30 from pcpao
- 2026-05-19PCPAOCaptured PCPAO_131562_ba10cb30 from pcpao
- 2026-05-22PCPAOCaptured PCPAO_129049_ba10cb30 from pcpao
- 2026-05-25PCPAOCaptured PCPAO_144848_ba10cb30 from pcpao
- 2026-05-27PCPAOCaptured PCPAO_126942_ba10cb30 from pcpao
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
14.2 mi
Round trip
28.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 14.2 mi | 28.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 15.2 mi | 30.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 34.7 mi | 69.5 |
| quarry | Wingate Creek Mine | Lithia | 38.1 mi | 76.2 |
| quarry | Four Corners | Lithia | 41.1 mi | 82.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 41.2 mi | 82.5 |
| sand pit | County Line Mine | Spring Hill | 43.6 mi | 87.2 |
| quarry | South Pasture Mine | Lithia | 43.8 mi | 87.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| stpete_click2gov | 01-12000601 | 2026-04-19 | Open ↗ |
| stpete_click2gov | 02-02000062 | 2026-04-19 | Open ↗ |
| pcpao | PCPAO_143676_ba10cb30 | 2026-05-17 | Open ↗ |
| pcpao | PCPAO_131562_ba10cb30 | 2026-05-19 | Open ↗ |
| pcpao | PCPAO_129049_ba10cb30 | 2026-05-22 | Open ↗ |
| pcpao | PCPAO_144848_ba10cb30 | 2026-05-25 | Open ↗ |
| pcpao | PCPAO_126942_ba10cb30 | 2026-05-27 | Open ↗ |
Parcel Detail
Pinellas County Property Appraiser
PropertyPCPAO ↗
- Folio
- 143676
- Strap
- 07-31-17-11376-006-0220
- Address
- 535 35th Ave N
- Zip
- 33704
- Acreage
- 0.1627 ac
- Sq ft
- 7,087
- Year built
- 2021
- Use
- 0110 Single Family ...
- Subdivision
- BRIDGEWAY ADD
Owner of record
ATKINSON, KEENAN M
SCHMIDT, KRISTA N
Last sale
2021-03-01
$750,000
Appraiser valuation
- Just (market)
- $892,061
- Assessed
- $563,543
- Taxable
- $512,821
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/535-35th-ave-n-pinellas-fl-e86e7ad9