Leads/530c8b82
Approved · unknownMonroe County

FDOT — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-REPAIR/REHABILITATION

Monroe County — FDOT Contract E6P31

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-REPAIR/REHABILITATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$17.7M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- B R# 900101 - BRIDGE-. Vendor: FREYSSINET, INC.. Cost: $17,733,651. | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20) | FDOT public project (+15) | size signal: $17,733,651 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E6P31_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
MARATHON TRANSFER STATION · Marathon
One-way
8.4 mi
Round trip
16.7 mi
Closest import source (quarry)
Windley Quarry
One-way
40.0 mi
Round trip
79.9 mi
TypeNameCityOne-wayRT mi
transfer stationMARATHON TRANSFER STATIONMarathon8.4 mi16.7
landfillCUDJOE KEY LANDFILLCudjoe Key21.3 mi42.7
transfer stationLONG KEY TRANSFER STATIONLong Key23.5 mi47
transfer stationNEW ROCKLAND RECYCLING CENTERKey West32.8 mi65.5
transfer stationCITY OF KEY WEST SOLID WASTE TRANSFER STATIONKey West32.8 mi65.7
transfer stationKEY WEST TRANSFER STATION AND HAULING SERVICE INCKey West36.6 mi73.2
landfillMount Trashmore37.3 mi74.6
quarryWindley Quarry40.0 mi79.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Monroe County Permits
Florida Keys Building Department
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E6P31_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Monroe
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/530c8b82