Leads/51fa6701
Approved · planningManatee County

BYPASS LANE MINOR MOD

3333 LENA ROAD, BRADENTON, FL, 34202

Load estimate pending
Lifecycle
Permitted as of Jan 6, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

BYPASS LANE MINOR MOD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/6/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$20.3M
Actual — from source record
Acreage
Parcel 567110051
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
SCS ENGINEERS
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $20,258,358 valuation (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0177559-015-EM from fdep_erp
  2. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0177559-014-EM from fdep_spgp
  3. 2026-06-03FL_DOR_CADASTRAL
    Captured FDOR_567110051_8462d672 from fl_dor_cadastral
  4. 2026-06-12FL_DOR_CADASTRAL
    Captured FDOR_567110051_51fa6701 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.0 mi
Round trip
32 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin16.0 mi32
quarryWingate Creek MineLithia19.7 mi39.4
quarryTampa Cement Grinding PlantTampa32.1 mi64.1
quarrySouth Pasture MineLithia32.7 mi65.3
quarryFour CornersLithia35.3 mi70.6
quarryFlorida Shell & Fill Company LLCNaples36.9 mi73.8
quarry4M-31 MineAlva40.0 mi80.1
quarrySouth Fort Meade MineLithia43.9 mi87.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SCS ENGINEERS

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0177559-015-EM2026-05-24Open ↗
fdep_spgpFDEP_SPGP_0177559-014-EM2026-05-28Open ↗
fl_dor_cadastralFDOR_567110051_8462d6722026-06-03Open ↗
fl_dor_cadastralFDOR_567110051_51fa67012026-06-12Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
567110051
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/51fa6701