Ready Mix Concrete Plant — EAST PLANT

EAST PLANT 9TH ST E, BRADENTON, FL, 34208

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Ready Mix Concrete Plant — EAST PLANT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Ready Mix Concrete Plant INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_0810037 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
3.5 mi
Round trip
7 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.8 mi
Round trip
33.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin16.8 mi33.6
quarryWingate Creek MineLithia26.4 mi52.8
quarryTampa Cement Grinding PlantTampa32.1 mi64.2
quarrySouth Pasture MineLithia38.8 mi77.6
quarryFlorida Shell & Fill Company LLCNaples39.2 mi78.4
quarryFour CornersLithia40.7 mi81.3
quarry4M-31 MineAlva46.5 mi92.9
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton3.5 mi7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_08100372026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)