Approved · unknownMARION County
Cleanup (petroleum cleanup) — FL THOROUGHBRED INDUSTRY BLDG
108 N PINE AVE, OCALA, FL, 32671
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — FL THOROUGHBRED INDUSTRY BLDG
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 2868-006-000
Est truck loads
—
Needs site plan parse
Sources seen
10
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797484 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_2868-006-000_51809986 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950811 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_2868-006-000_24edf5a9 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981461 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_2868-006-000_e00081da from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052909 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_2868-006-000_b3df6d37 from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103906 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_2868-006-000_5f66a229 from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
4.9 mi
Round trip
9.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 4.9 mi | 9.8 |
| quarry | Stavola NW Pit | Ocala | 5.6 mi | 11.3 |
| quarry | Lowell Mine & Mill | Ocala | 9.7 mi | 19.3 |
| quarry | Reddick Mine | Pompano Beach | 12.6 mi | 25.2 |
| quarry | 328 Pit | Ocala | 13.6 mi | 27.2 |
| sand pit | Lynne Mine | Davenport | 14.6 mi | 29.2 |
| quarry | Ocala Quarry | Atlanta | 14.5 mi | 29.1 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 22.2 mi | 44.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797484 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_2868-006-000_51809986 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950811 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_2868-006-000_24edf5a9 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981461 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_2868-006-000_e00081da | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052909 | 2026-06-23 | Open ↗ |
| marionpa | MARIONPA_2868-006-000_b3df6d37 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103906 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_2868-006-000_5f66a229 | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 2868-006-000
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/51809986