Leads/50911ed8
Approved · unknownFLAGLER County

Mitigation bank — Brick Road (2,945 ac)

Brick Road, FLAGLER County, FL

Load estimate pending
Lifecycle
Permitted as of Jun 1, 2008
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Brick Road (2,945 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 6/1/2008 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 2,945 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Kae Hovater. | stage=permit_issued, but stale (18y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (18y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (18y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_4-035-106896-1 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY · Bunnell
One-way
8.2 mi
Round trip
16.4 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
11.1 mi
Round trip
22.1 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials East PalatkaMurfresboro11.1 mi22.1
sand pitKeuka Sand PlantJacksonville32.7 mi65.4
quarryEdgar Minerals, Inc.Davenport34.2 mi68.4
sand pitGrandin Sand PlantJacksonville34.3 mi68.5
sand pitGoldhead Sand PlantJacksonville39.2 mi78.5
sand pitLynne MineDavenport42.0 mi84.1
quarryThe Chemours Company FC LLCStarke48.0 mi96
landfillFLAGLER CDS, INCORPORATED C&D DEBRIS FACILITYBunnell8.2 mi16.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Flagler County Permits
Palm Coast Building Services
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_4-035-106896-12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
FLAGLER
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/50911ed8