Leads/4f7e36c6
Approved · unknownPINELLAS County

USACE 404 — 2074 TANGLEWOOD WAY NE, ST. PETERSBURG

2074 TANGLEWOOD WAY NE, ST. PETERSBURG, ST. PETERSBURG, FL, 33702

~60loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Mar 22, 2018
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 2074 TANGLEWOOD WAY NE, ST. PETERSBURG

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/22/2018 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2392 ac
Parcel 296844
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CRONIN, DANIEL
Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (8y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0362414-001-EE from fdep_spgp
  2. 2026-07-05PCPAO
    Captured PCPAO_296844_4f7e36c6 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
12.3 mi
Round trip
24.7 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa12.3 mi24.7
quarryCaloosa MaterialsRuskin13.8 mi27.5
quarryCentral State Aggregates LLCZephyrhill31.9 mi63.8
quarryWingate Creek MineLithia37.7 mi75.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 38.8 mi77.6
quarryFour CornersLithia39.3 mi78.6
sand pitCounty Line MineSpring Hill41.4 mi82.7
quarrySouth Pasture MineLithia42.5 mi85
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CRONIN, DANIEL

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0362414-001-EE2026-05-28Open ↗
pcpaoPCPAO_296844_4f7e36c62026-07-05Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
296844
Strap
33-30-17-89757-001-0270
Address
2074 Tanglewood Way Ne
Zip
33702
Acreage
0.2392 ac
Sq ft
10,420
Year built
1974
Use
0110 Single Family ...
Subdivision
TANGLEWOOD ISLE SUB
Owner of record
CRONIN, DANIEL
CRONIN, LISA
Last sale
2017-09-01
$1,140,000
Appraiser valuation
Just (market)
$832,938
Assessed
$783,869
Taxable
$733,147

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4f7e36c6