Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — MOBIL-GANDY #397
4101 W GANDY BLVD, TAMPA, FL, 33611
~14loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 12, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — MOBIL-GANDY #397
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.054 ac
Parcel 1291760000
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-12FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87954677 from fdep_cleanup_sites
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87985328 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_1291760000_4edce961 from hcpa
- 2026-06-21HCPACaptured HCPA_1291760000_ade7444a from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.2 mi
Round trip
10.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 5.2 mi | 10.3 |
| quarry | Caloosa Materials | Ruskin | 13.9 mi | 27.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.2 mi | 50.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 34.0 mi | 68 |
| quarry | Four Corners | Lithia | 34.3 mi | 68.6 |
| quarry | Wingate Creek Mine | Lithia | 36.2 mi | 72.5 |
| sand pit | County Line Mine | Spring Hill | 37.3 mi | 74.6 |
| quarry | South Pasture Mine | Lithia | 38.6 mi | 77.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87954677 | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87985328 | 2026-06-16 | Open ↗ |
| hcpa | HCPA_1291760000_4edce961 | 2026-06-21 | Open ↗ |
| hcpa | HCPA_1291760000_ade7444a | 2026-06-21 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1291760000
- Strap
- A-04-30-18-3WN-000000-00014.1
- Address
- 4101 W GANDY BLVD, TAMPA
- Zip
- 33611
- Acreage
- 0.054 ac
- Sq ft
- 2,372
- Homestead
- NO
Owner of record
COASTAL ACQUISITIONS INC
Last sale
2017-10-31
$800,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/4edce961