Leads/4e00801f
Approved · unknown

CCCL APPLICATION — Coastal permit application ME001599 (Pending applicant)

867 N Shore Dr., Anna Maria, FL 34216

Load estimate pending
Lifecycle
Filed as of May 14, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

CCCL APPLICATION — Coastal permit application ME001599 (Pending applicant)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/14/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-08FDEP_COASTAL_APPS
    Captured FDEP_COASTAL_APP_ME001599 from fdep_coastal_apps

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
14.3 mi
Round trip
28.6 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
21.6 mi
Round trip
43.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin21.6 mi43.3
quarryTampa Cement Grinding PlantTampa32.9 mi65.8
quarryWingate Creek MineLithia37.9 mi75.9
quarryFlorida Shell & Fill Company LLCNaples47.6 mi95.3
quarrySouth Pasture MineLithia49.1 mi98.3
quarryFour CornersLithia49.6 mi99.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton14.3 mi28.6
transfer stationA & S OIL RECOVERY OF FLORIDA INCSt Petersburg15.6 mi31.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_appsFDEP_COASTAL_APP_ME0015992026-06-08Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4e00801f