Mitigation bank — Tampa Bay (161 ac)
Tampa Bay, HILLSBOROUGH County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 11/30/2006 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_MITIGATION_BANKSCaptured FDEP_MITBANK_43-20546.02 from fdep_mitigation_banks
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 3.1 mi | 6.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 17.6 mi | 35.2 |
| quarry | Wingate Creek Mine | Lithia | 25.6 mi | 51.2 |
| quarry | Four Corners | Lithia | 32.0 mi | 63.9 |
| quarry | South Pasture Mine | Lithia | 33.0 mi | 66 |
| quarry | Central State Aggregates LLC | Zephyrhill | 37.8 mi | 75.5 |
| quarry | South Fort Meade Mine | Lithia | 44.8 mi | 89.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 48.5 mi | 97 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_mitigation_banks | FDEP_MITBANK_43-20546.02 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- HILLSBOROUGH
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/4d8bc397