Leads/4cde1de8
Approved · unknownHardee County

FDOT — (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE

Hardee County — FDOT Contract T1914

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$1.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Hubbard Construction Company
📞 (407) 654-3201
Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT awarded contract on (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE ($1,544,727) | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Size multiplier x1.3 (valuation $1,544,727) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | size signal: $1,449,907 valuation (+12) | FDOT public project (+15) | size signal: $1,449,907 valuation (+12) | FDOT public project (+15) | size signal: $1,449,907 valuation (+12) | FDOT public project (+15) | size signal: $1,449,907 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T1914_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
South Fort Meade Mine · Lithia
One-way
5.4 mi
Round trip
10.8 mi
TypeNameCityOne-wayRT mi
quarrySouth Fort Meade MineLithia5.4 mi10.8
quarrySouth Pasture MineLithia8.5 mi17
quarryFour CornersLithia14.8 mi29.5
quarryWingate Creek MineLithia19.7 mi39.4
quarry4M-31 MineAlva26.8 mi53.6
sand pitDiamond Sand PlantJacksonville28.2 mi56.4
sand pitLake Wales Dry PlantDavenport28.6 mi57.3
sand pitLake Wales Sand MineBrooksville28.6 mi57.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201
Subcontractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hardee County Permits
Wauchula Building Department
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T1914_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Hardee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4cde1de8