Approved · unknownHernando County
FDOT — SR 50 FROM US 301/SR 35 TO HERNANDO/SUMTER COUNTY LINE - ADD LANES & RECONSTRUCT
Hernando County — FDOT Contract E7O01
Load estimate pending
Lifecycle
Completed as of Nov 18, 2021
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 50 FROM US 301/SR 35 TO HERNANDO/SUMTER COUNTY LINE - ADD LANES & RECONSTRUCT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$48.8M
Actual — from source record
Acreage
—
Parcel R23 422 19 0000 0000 000A
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT awarded contract on AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF ($10,949,338) | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Size multiplier x1.3 (valuation $10,949,338) | Stage = awarded_public — actionable now (+10) | size signal: $48,811,431 valuation (+20) | size signal: $48,811,431 valuation (+20) | size signal: $48,811,431 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E7O01_1 from fdot_active
- 2026-06-11FL_DOR_CADASTRALCaptured FDOR_R23 422 19 0000 0000 000A_48622e15 from fl_dor_cadastral
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
West Florida Aggregate · Webster
One-way
1.7 mi
Round trip
3.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | West Florida Aggregate | Webster | 1.7 mi | 3.4 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 12.3 mi | 24.6 |
| quarry | St Catherine Mine | Brooksville | 13.9 mi | 27.9 |
| quarry | Center Hill Mine | Brooksville | 14.6 mi | 29.3 |
| quarry | Brooksville South Cement Plant | Brooksville | 17.0 mi | 34 |
| quarry | Brooksville Quarry | Brooksville | 17.9 mi | 35.8 |
| quarry | SUMTERVILLE MINE | Ocala | 17.9 mi | 35.7 |
| quarry | Sumterville Cement Plant | Sumterville | 17.9 mi | 35.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E7O01_1 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_R23 422 19 0000 0000 000A_48622e15 | 2026-06-11 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- R23 422 19 0000 0000 000A
- County
- Hernando
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
Award
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/48622e15