Approved · unknownLake County
FDOT — SR 40 FROM SR 35 TO VOLUSIA COUNTY LINE ITS SAFETY DEPLOYMEN T - ITS COMMUNICATION SYSTEM
Lake County — FDOT Contract E54F0
Load estimate pending
Lifecycle
Completed as of Jun 13, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 40 FROM SR 35 TO VOLUSIA COUNTY LINE ITS SAFETY DEPLOYMEN T - ITS COMMUNICATION SYSTEM
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$3.1M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT utilities contract — SR 40 FROM SR 35 TO VOLUSIA COUNTY LINE ITS SAFETY DEPLOYMEN T - ITS COMMUNICATI. Vendor: SICE INC. Cost: $3,082,346. | FDOT public project (+15) | size signal: $3,082,346 valuation (+12) | FDOT public project (+15) | size signal: $3,082,346 valuation (+12) | FDOT public project (+15) | size signal: $3,082,346 valuation (+12) | FDOT public project (+15) | size signal: $3,082,346 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E54F0_3 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Lynne Mine · Davenport
One-way
1.3 mi
Round trip
2.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Lynne Mine | Davenport | 1.3 mi | 2.5 |
| quarry | NORTH MINE | OCALA | 12.1 mi | 24.3 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 14.5 mi | 29.1 |
| quarry | Stavola NW Pit | Ocala | 16.5 mi | 33.1 |
| quarry | Lowell Mine & Mill | Ocala | 19.8 mi | 39.6 |
| quarry | Reddick Mine | Pompano Beach | 21.0 mi | 42 |
| sand pit | Lisbon Sand | Lexington | 23.2 mi | 46.3 |
| quarry | Ocala Quarry | Atlanta | 25.0 mi | 50 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E54F0_3 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Lake
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/48126b01