Leads/4811-21st-st-n-8a1c1546
Approved · unknownPinellas County

4811 21ST ST N

4811 21ST ST N

~20loads
concrete spoil + demo debris
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

4811 21ST ST N

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.4389 ac
Parcel 389527
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
A & S CONSTRUCTION
📞 (407) 721-2343
Developer / Applicant
SHEPARD, MARK K
The story

The project at 4811 21st St N involves site development with a focus on demolition in a commercial/industrial setting. This presents a significant opportunity for hauling providers, as the closed stage indicates upcoming earthwork and material transport needs. Key contacts include A & S Construction as the general contractor at (407) 721-2343 and Mark K Shepard, the owner/developer, who can facilitate further project details.

Why this is a hauling opportunity: Commercial/industrial permit with likely earthwork | Connector base: 75 | Keyword match: 1 categories (+5) | size signal: (+6) | size signal: (+6) | size signal: ~20 est. loads (+6) | size signal: ~20 est. loads (+6)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-02-22STPETE_CLICK2GOV
    Captured 14-04000170 from stpete_click2gov
  2. 2026-05-17PCPAO
    Captured PCPAO_389273_8a1c1546 from pcpao
  3. 2026-05-21PCPAO
    Captured PCPAO_389380_8a1c1546 from pcpao
  4. 2026-05-22PCPAO
    Captured PCPAO_389444_8a1c1546 from pcpao
  5. 2026-05-25PCPAO
    Captured PCPAO_389880_8a1c1546 from pcpao
  6. 2026-05-27PCPAO
    Captured PCPAO_389527_8a1c1546 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
SHEPARD, MARK K
Contractor
A & S CONSTRUCTION
24 active projects · Pinellas
📞 (407) 721-2343
People (1)

Permits & Sources

Every connector that's seen this project

ACTIVEDemolition Permit(DEMOLITION OF ALL OTHER BLDGS & STRUCTURES)

Structure coming down — debris off-haul is immediate and short-lived. Call fast.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov14-040001702026-02-22Open ↗
pcpaoPCPAO_389273_8a1c15462026-05-17Open ↗
pcpaoPCPAO_389380_8a1c15462026-05-21Open ↗
pcpaoPCPAO_389444_8a1c15462026-05-22Open ↗
pcpaoPCPAO_389880_8a1c15462026-05-25Open ↗
pcpaoPCPAO_389527_8a1c15462026-05-27Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
389273
Strap
01-31-16-76716-001-0040
Address
4811 21st St N
Zip
33714
Acreage
0.4389 ac
Sq ft
19,118
Year built
1925
Use
0110 Single Family ...
Subdivision
ROSEDALE SUB REPLAT
Owner of record
SHEPARD, MARK K
DREUX, CLAUDINE E
Last sale
2014-11-01
$100(transfer)
Appraiser valuation
Just (market)
$437,777
Assessed
$109,528
Taxable
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/4811-21st-st-n-8a1c1546