TEC BIG BEND N-S CHANNEL DREDG
702 N. FRANKLIN ST., TAMPA, FL, 33602
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 7/15/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21FDEP_ERPCaptured FDEP_ERP_0462690-001 from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 6.9 mi | 13.8 |
| quarry | Tampa Cement Grinding Plant | Tampa | 9.9 mi | 19.7 |
| quarry | Four Corners | Lithia | 26.5 mi | 53 |
| quarry | Wingate Creek Mine | Lithia | 26.8 mi | 53.5 |
| quarry | Central State Aggregates LLC | Zephyrhill | 28.8 mi | 57.7 |
| quarry | South Pasture Mine | Lithia | 29.7 mi | 59.5 |
| quarry | South Fort Meade Mine | Lithia | 40.9 mi | 81.8 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 41.0 mi | 82 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0462690-001 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/471901ef