Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — EDWARD BROSNAN INC
2121 W KENNEDY BLVD, TAMPA, FL, 33606
~7loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 11, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — EDWARD BROSNAN INC
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.029 ac
Parcel 1839360000
Est truck loads
—
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942807 from fdep_cleanup_sites
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983672 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_1839360000_a8cf0a62 from hcpa
- 2026-06-24HCPACaptured HCPA_1839360000_44e396c1 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88085717 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_1839360000_e3b82718 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.5 mi
Round trip
5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 2.5 mi | 5 |
| quarry | Caloosa Materials | Ruskin | 16.9 mi | 33.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.2 mi | 42.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.5 mi | 61 |
| quarry | Four Corners | Lithia | 33.6 mi | 67.3 |
| sand pit | County Line Mine | Spring Hill | 34.1 mi | 68.2 |
| quarry | Wingate Creek Mine | Lithia | 37.8 mi | 75.6 |
| quarry | South Pasture Mine | Lithia | 38.6 mi | 77.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87942807 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983672 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_1839360000_a8cf0a62 | 2026-06-21 | Open ↗ |
| hcpa | HCPA_1839360000_44e396c1 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88085717 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_1839360000_e3b82718 | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1839360000
- Strap
- A-23-29-18-4S4-000005-00007.0
- Address
- 2121 W KENNEDY BLVD, TAMPA
- Zip
- 33606
- Acreage
- 0.029 ac
- Sq ft
- 1,261
- Homestead
- NO
Owner of record
LOCAL TAMPA KENNEDY LLC
Last sale
2023-08-14
$4,876,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/44e396c1