Leads/44200861
Approved · application_filedHernando County

BKV - Runway 3-21 Extension

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

BKV - Runway 3-21 Extension

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$6.8M
Actual — from source record
Acreage
Parcel R25 423 18 0000 0030 0000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Steve Miller
Why this is a hauling opportunity: Base unknown/other (20) | roadway/highway keywords (+25) | size signal: $6,819,594 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_929793 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_R25 423 18 0000 0030 0000_44200861 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
5.6 mi
Round trip
11.1 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 5.6 mi11.1
sand pitCounty Line MineSpring Hill7.3 mi14.5
quarryBrooksville QuarryBrooksville8.5 mi17
quarryBrooksville South Cement PlantBrooksville8.9 mi17.8
quarryCalcium PlantJacksonville12.2 mi24.4
quarryCenter Hill MineBrooksville14.7 mi29.3
quarryWest Florida AggregateWebster19.7 mi39.5
quarryCentral State Aggregates LLCZephyrhill20.2 mi40.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Steve Miller

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hernando County Permits
Spring Hill / Brooksville Building
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9297932026-05-17Open ↗
fl_dor_cadastralFDOR_R25 423 18 0000 0030 0000_442008612026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
R25 423 18 0000 0030 0000
County
Hernando
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/44200861