Approved · unknownPalm Beach County
FDOT — SR-7/US-441 FROM NORTH OF GLADES ROAD TO NORTH OF BRIDGE BRO OK DRIVE - RESURFACING
Palm Beach County — FDOT Contract T4693
Load estimate pending
Lifecycle
Active as of Jul 7, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR-7/US-441 FROM NORTH OF GLADES ROAD TO NORTH OF BRIDGE BRO OK DRIVE - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$9.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR-7/US-441 FROM NORTH OF GLADES ROAD TO NORTH OF BRIDGE BRO OK DRIVE - RESURFAC. Vendor: WEEKLEY ASPHALT PAVING, INC.. Cost: $9,501,712. | FDOT public project (+15) | size signal: $9,501,712 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $9,501,712 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $9,501,712 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T4693_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
24.0 mi
Round trip
48.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Palm Beach Aggregates LLC | Jacksonville | 24.0 mi | 48.1 |
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 33.8 mi | 67.7 |
| quarry | FEC QUARRY | MIAMI | 37.1 mi | 74.2 |
| quarry | PENNSUCO QUARRY | Medley | 37.3 mi | 74.6 |
| quarry | PENNSUCO CEMENT PLANT | Medley | 37.3 mi | 74.6 |
| quarry | Star Quarries | SOUTH BAY | 38.2 mi | 76.3 |
| quarry | Big Cypress Rock Mine | Clewiston | 40.9 mi | 81.8 |
| quarry | Miami Quarry | Jacksonville | 42.9 mi | 85.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Palm Beach County Permits ↗West Palm Beach Planning, Zoning & Building
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T4693_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Palm Beach
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/434641af