Leads/420-church-st-apts-orange-fl-9d334643
Approved · unknownOrange County

420 CHURCH ST APTS

420 E CHURCH ST, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

420 CHURCH ST APTS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
420 CHURCH ST APTS
Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10NY56 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
19.3 mi
Round trip
38.6 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont19.3 mi38.6
sand pitIndependent MineDavenport20.0 mi40
sand pitFour Corners Sand MineBrooksville20.2 mi40.3
quarryS & L Materials IncKISSIMMEE21.9 mi43.9
quarryBeeline MineOrlando23.0 mi46
sand pitHilochee Sand MineDavenport23.1 mi46.3
sand pitCypress SandLexington24.2 mi48.3
sand pitLake Sand PlantJacksonville24.6 mi49.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
420 CHURCH ST APTS

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10NY562026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/420-church-st-apts-orange-fl-9d334643