Leads/40537230
Approved · planning

FEDEX BRADENTON

4605 18TH ST E, BRADENTON, FL, 34203

Load estimate pending
Lifecycle
Permitted as of Mar 10, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FEDEX BRADENTON

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/10/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
ZNS ENGINEERING
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0469712-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
2.0 mi
Round trip
3.9 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.9 mi
Round trip
35.8 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.9 mi35.8
quarryWingate Creek MineLithia25.8 mi51.5
quarryTampa Cement Grinding PlantTampa33.4 mi66.8
quarryFlorida Shell & Fill Company LLCNaples37.5 mi75.1
quarrySouth Pasture MineLithia38.6 mi77.1
quarryFour CornersLithia40.7 mi81.5
quarry4M-31 MineAlva45.2 mi90.4
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton2.0 mi3.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ZNS ENGINEERING

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0469712-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/40537230