Leads/3mg-solutions-llc-project-hillsborough-county-hillsborough-fl-83ed6915
Active · clearingHillsborough County

NOC – Wilson Ronald J, Wilson Frances L | 3MG Solutions LLC | 820 Greenview Dr

820 Greenview Dr, Apollo Beach

~5loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Mar 11, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

NOC – Wilson Ronald J, Wilson Frances L | 3MG Solutions LLC | 820 Greenview Dr

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.034 ac
Parcel 0526642406
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
3MG SOLUTIONS LLC
📞 (321) 638-5655
Developer / Applicant
T ONEILL CHARLES
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Complete residential re-roof | stage=under_construction, recent (+10) | single-trade residential permit — capped low | stage=under_construction, recent (+10) | single-trade residential permit — capped low | stage=under_construction, recent (+10) | single-trade residential permit — capped low | stage=under_construction, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-12OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026095085 from official_records_noc
  2. 2026-03-20OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026108437 from official_records_noc
  3. 2026-05-22HCPA
    Captured HCPA_0190007800_670c604c from hcpa
  4. 2026-05-25HCPA
    Captured HCPA_0526642406_670c604c from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
4.3 mi
Round trip
8.7 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin4.3 mi8.7
quarryTampa Cement Grinding PlantTampa12.0 mi24.1
quarryWingate Creek MineLithia25.7 mi51.3
quarryFour CornersLithia27.4 mi54.7
quarrySouth Pasture MineLithia29.9 mi59.8
quarryCentral State Aggregates LLCZephyrhill31.4 mi62.7
quarrySouth Fort Meade MineLithia41.3 mi82.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 43.3 mi86.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
3MG SOLUTIONS LLC
1 active project · Hillsborough
📞 (321) 638-5655

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20260950852026-03-12Open ↗
official_records_nocHillsborough_20261084372026-03-20Open ↗
hcpaHCPA_0190007800_670c604c2026-05-22Open ↗
hcpaHCPA_0526642406_670c604c2026-05-25Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0190007800
Strap
U-06-28-18-0WS-000002-00010.0
Address
13719 CHESTERSALL DR, TAMPA
Zip
33624
Acreage
0.044 ac
Sq ft
1,931
Homestead
YES
Owner of record
ONEILL CHARLES T
ONEILL KAREN D
Last sale
1998-05-01
$230,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/3mg-solutions-llc-project-hillsborough-county-hillsborough-fl-83ed6915