Approved · unknownDade County
Beach nourishment — Golden Beach - Sunny Isles - Haulover Beach Park (24,934 cy)
Golden Beach - Sunny Isles - Haulover Beach Park, Dade County, FL
Load estimate pending
Lifecycle
Completed as of Apr 1, 2019
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Beach nourishment — Golden Beach - Sunny Isles - Haulover Beach Park (24,934 cy)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$299K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Beach nourishment Miami-Dade County Shore Protection Project — 24,934 cy placed. Source: Upland. Type: Dune Restoration. Counties with prior nourishment cycle every 6-10 years. | size signal: (+5) | size signal: (+5) | size signal: (+5) | size signal: (+5) | size signal: $299,208 valuation (+5) | size signal: $299,208 valuation (+5)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SAND_PLACEMENTCaptured FDEP_SANDPLACE_454 from fdep_sand_placement
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
FEC QUARRY · MIAMI
One-way
15.7 mi
Round trip
31.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | FEC QUARRY | MIAMI | 15.7 mi | 31.5 |
| quarry | PENNSUCO QUARRY | Medley | 16.2 mi | 32.3 |
| quarry | PENNSUCO CEMENT PLANT | Medley | 16.2 mi | 32.3 |
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 17.4 mi | 34.7 |
| quarry | Epic Stoneworks, Inc. | Cutler Bay | 17.3 mi | 34.7 |
| quarry | Miami Quarry | Jacksonville | 19.4 mi | 38.9 |
| quarry | Miami Cement Plant | Miami | 21.7 mi | 43.4 |
| quarry | Krome Quarry | MIAMI | 28.8 mi | 57.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_sand_placement | FDEP_SANDPLACE_454 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Dade
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/3dcc1894