Leads/3d0ba5ef
Approved · unknownPASCO County

USACE 404 — 6138 RIVER RD

6138 RIVER RD, NEW PORT RICHEY, FL, 34652

~50loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Dec 20, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 6138 RIVER RD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/20/2022 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2 ac
Parcel 05-26-16-0030-20900-0090
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
ROGERS JOSEPH
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~50 est. loads (+6) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0344590-001-EE from fdep_spgp
  2. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0402332-002-EE from fdep_spgp
  3. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0402332-001-EE from fdep_spgp
  4. 2026-06-03PASCOPA
    Captured PASCOPA_05-26-16-0030-20900-0090_4bb28317 from pascopa
  5. 2026-06-03PASCOPA
    Captured PASCOPA_05-26-16-0030-20900-0090_3d0ba5ef from pascopa
  6. 2026-06-03PASCOPA
    Captured PASCOPA_05-26-16-0030-20900-0090_a2b16208 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.9 mi
Round trip
31.8 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.9 mi31.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.3 mi34.5
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.7
quarryTampa Cement Grinding PlantTampa27.6 mi55.1
quarryBrooksville QuarryBrooksville28.9 mi57.7
quarryBrooksville South Cement PlantBrooksville29.7 mi59.3
quarryCalcium PlantJacksonville32.4 mi64.7
quarryCenter Hill MineBrooksville36.2 mi72.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ROGERS JOSEPH

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0344590-001-EE2026-05-28Open ↗
fdep_spgpFDEP_SPGP_0402332-002-EE2026-05-28Open ↗
fdep_spgpFDEP_SPGP_0402332-001-EE2026-05-28Open ↗
pascopaPASCOPA_05-26-16-0030-20900-0090_4bb283172026-06-03Open ↗
pascopaPASCOPA_05-26-16-0030-20900-0090_3d0ba5ef2026-06-03Open ↗
pascopaPASCOPA_05-26-16-0030-20900-0090_a2b162082026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
05-26-16-0030-20900-0090
Strap
05-26-16-0030-20900-0090
Address
6138 RIVER ROAD, NEW PORT RICHEY
Zip
34652
Acreage
0.2 ac
Sq ft
8,712
Use
Improved
Owner of record
ROGERS JOSEPH
Last sale
2009-07-01
$143,900
Appraiser valuation
Just (market)
$284,885

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/3d0ba5ef